Big Boy Test at Trestles

I didn’t wake up when Mitch called me at 5am yesterday but we managed to go today to Trestles. I actually finished making the board on the parking lot. I wasn’t happy the leash plug hole so I redrilled a hole, got it filled with resin, let it cure on the ride down and drilled the final leash hole on the lot. Since I have short arms, carrying the 23 inch wide board to Trestles was a mission. The thing catches waves so easily and it just glides. So stoked. David took all these pictures. What a legend.

serious

Sickk bra.

legendI didn’t see this guy out there but David clearly did. What a legend.

mitchlayback1Layback one.

mitchalybackLayback two.

stoke

Sooo

stoke1Stokkkedd.

mitchhandbarrelMitch’s hand getting pitted.

mitch2Mitch’s air sequence: 1)Eyeing the ramp.

mitch32)About to launch.

mitch43)Puntastic.

mitch54)Eyeballing the landing.

mitchonbigboyMitch having a go on big boy.

vansshoesMy vans watched Mitch and me surf the whole time.

fintasticFintastic.

Check out the whole Construction Process of the Big Boy:
Hull Template
Hull Construction Begins
Surfboard Construction Day 2
Board Status
Surfboard Construction: Glassing 60z On Top
Tipping The Board
Hot Coat Phase II: Fin Box Installation
Almost Finished

Advertisements

One Response

  1. […] posts from the past: Trestles Night Surf Big Boy Test at Trestles Trestles Surf Possibly related posts: (automatically generated)MaliceHug My WatermelonFor Jenny […]

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: